Preservation work on two mainline Route 885 Boulevard of the Allies bridges and several ramps at the interchange are included in this $35.41 million project. in the area of the Birmingham Bridge during this time frame. I-376 (Parkway East) will have single-lane restrictions as needed from 9 a.m. Monday through Thursday, July 17-20 as crews conduct steel repairs, bearing replacement, expansion dam removal preparatory work and concrete repairs. Follow Grant Street to the Boulevard of the AlliesĪdditionally, single-lane restrictions will occur on Route 885 (Boulevard of the Allies) in both directions between Hamlet Street and the Crosstown Boulevard from 9 a.m.Take the Grant Street (Exit 71A) left-hand off-ramp.From westbound (inbound) I-376, continue past the closed ramp.each night as crews conduct expansion dam removal preparatory work and concrete repairs. Overnight closures of the ramp carrying traffic from westbound (inbound) I-376 (Parkway East) to northbound Boulevard of the Allies (Route 885) will occur from 9 p.m. PennDOT District 11 is announcing overnight closures of the westbound I-376 (Parkway East) ramp to northbound Boulevard of the Allies (Route 885) in the City of Pittsburgh, Allegheny County, will occur Monday night, July 17 through Thursday night, July 20 weather permitting. Reach her at or 41.Westbound I-376 Ramp to Northbound Boulevard of the Allies Overnight Closures Monday, July 17th – Thursday, July 20th Susan Jones is editor of the University Times. While the work will continue into the fall semester, Rainey said PennDOT and contractor Gulisek Construction are aware of the dates in late August when students will be arriving at all of Oakland’s colleges and won’t be doing any work during those times. After that, the new signals will be tested before the old poles are removed. Milling and paving is expected to be completed on Zone 2 of the project by the first week in September. June 24, During this time, traffic will be restricted to one lane.ĭetour maps for the Parkway East Forbes Avenue exit ramp closure will be posted on the Forbes Betterment project website. Milling operations on Forbes Avenue, starting at Craft Avenue and going to South Craig Street, will begin at 6 p.m. June 22, from the exit ramp to Craft Avenue. The Parkway East Forbes Avenue exit ramp will close from 8 p.m. When the paving is done, new piano key-style crosswalks will be painted at 18 intersections to make them more visible to drivers, “so they don’t stop in them,” Rainey said. The work will involve closing one lane at a time, so the road will not be completely shut down. PennDOT and Gulisek Construction will begin milling and paving work next weekend, according to Rainey. “The overall goal is to enhance safety for pedestrians along the entire corridor,” Rainey said. The push buttons also have audible signals for the visually impaired. The signals all will be retimed, Rainey said, to allow 3 to 5 extra seconds for pedestrians to cross the street when no traffic will be moving. “So timing is critical, not only when we put the new poles in but that they have electricity and they’re ready for that transition before the old poles are removed.”Īlso being installed are push buttons that trigger the pedestrian phase of the signal at several intersections in this congested part of Forbes. Craig Street), this is the most congested part of the whole project,” Rainey said. “One of the challenges that we’ve been having in Zone 2 (Craft Avenue to S. The entire project is scheduled to be completed before construction season ends in November, Rainey said. This is all part of the multi-year Forbes Avenue Betterment project that includes work from the Birmingham Bridge to Margaret Morrison Street near Carnegie Mellon University. “Once it’s done it’s going to be beautiful,” said Mavis Rainey, executive director of Oakland Transportation Management Association.Īt several intersections, crews have been replacing ramps to make them ADA compliant and putting in poles to hold new signals. Walking down the Forbes Avenue sidewalks from Craft Avenue to the Cathedral of Learning the past few weeks has been a bit like playing the arcade game Frogger - switching sides or jumping into the street to avoid ramp construction while avoiding getting hit by a car.īut soon the sidewalk work will give way to even more disruptive milling and paving.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |